Billy Swails Boulevard 4B

BSB 4B
Billy Swails Blvd Project Page Banner_1350x367

Description

Billy Swails Boulevard 4B is the final roadway segment that will complete what was originally named the Hungryneck Boulevard corridor, a parallel route to US 17 and Rifle Range Road. The anticipated cross-section is a two-lane divided roadway with a landscaped median, turn lanes and bike and pedestrian facilities. The project will join the existing Sweetgrass Basket Parkway on the west to the existing portion of Billy Swails Boulevard to the east.

Status

Preliminary engineering began in August 2017 and a Public Information Meeting was held February 27, 2018. Traffic analysis and modeling is ongoing.

Schedule

  • Design:  August 2020
  • Construction:  August 2022

Cost

$12,568,497 ($2,568,497 TOMP and $10,000,000 Federal)

Resources

Billy Swails Boulevard Public Meeting Notice (2/27/18)

Billy Swails Boulevard Aerial Display (2/27/18)

Billy Swails Boulevard Public Information Meeting Handout (2/27/18)

Billy Swails Boulevard Network Display (2/27/18)

Preferred Alignment of Billy Swails Pkwy Phase 4B

Contact

Paul Lykins, Project Engineer 

  • Ph: (843) 856-3080 
  • Email